+8618706518722
Home > 公司新聞
Classify

Weifang Dongyang Haike Heavy Industry Co., Ltd. Precautions for Large Sand Digging Equipment

2023-06-06

Different from ordinary sand dredgers, large sand dredgers have some extra precautions during use due to their larger size. Let's take a look together.

Firstly, after the two diesel engines of the sand digging equipment are started, the speed needs to be adjusted to the required speed. Then, slowly release the brake of the boom and stop the downward movement when the sand in the bucket reaches more than two-thirds. Repeat the operation when it reaches one-third.

When parking the boom at a 45 degree angle to the water surface; When cornering, it is also necessary to park. At this time, it is also important to pay attention to the amount of sand in the hopper, as the forward speed is determined by it, and a certain degree of flexibility should be maintained when moving forward and backward. In the process of moving forward, if encountering sand layer collapse, mechanical difficulty, or inability to pull, it is necessary to first loosen the traction rope, wait for the ship to retreat until excavation, and then tighten the traction rope again.

During the forward movement of the ship, there may occasionally be large stones or mud layers. In such cases, especially for large sand dredgers, there will be severe vibrations. At this time, the sand digging arm should be immediately lifted to avoid obstacles before resuming sand digging to avoid blind advance and equipment damage.

During use, it is also important to closely monitor the overall condition of the vessel, such as tightening screws in various parts, adding lubricating oil, chain pins, reducers, docking discs, and so on. When there is a flood season or a situation where work needs to be stopped, it is necessary to tie the ship tightly in a secure place to avoid it being washed away and causing unnecessary losses.

復(fù)制成功
Wechat: